What are the delivery methods for chain grate boilers

2023/12/08

What are the delivery methods for chain grate boilers

There are three ways for chain grate boilers to leave the factory, whether it is for equipment manufacturing, transportation and other issues, or for the convenience of boiler buyers to receive them:

Quick installation boiler: All boilers are installed in the factory and transported to the user as a whole.

Assembling the boiler: The boiler is divided into two parts (the upper part is the heating surface and the lower part is the combustion equipment) and assembled on site.

Loose boiler: All components of the boiler are shipped as loose parts and installed on site. The loose parts leaving the factory include heating surfaces, steel structures, combustion equipment, and other components. The furnace walls and insulation are also carried out on site.